Works In the Shop

03/18/16 Edition

*Update*

Ore Car Frames

Operations

Passenger Cars

Fab Lab 3D Laser

Fab Lab 3D Printer

PLL Caboose #3

Winter Project

Woodboro WI

Brainless Modeling

Choo Choo Store

Pickle Tub Cars

Pickle Salting Station

Corn Crib

Other Projects

Current Control Issues

Current Control Part 2

Help From DownUnder

Current Update

Scale House

Kit-A-Long

Black Jack's Bar

Modeling Starks WI

 

DCC Help Link (NCE)

DCC Testing

 

Modular Layouts

Photo Backdrops

Meeting the Masters

Achievement Program

At The Clearing

 

Contact Us

Google

Home

Members are Working on AP EE

Bob's new signals

Bob  installed 2 new Z-Stuff tri color signals

These new signals have optical sensors built into the base of the signal.

As a train passes the signal it shows RED as long as the train is being sensed it remains RED. After the train clears the detection the signal remains RED for a set time train length (8 seconds is the default) then it turns to YELLOW. After a second train length the signal shows GREEN until it detects another train.  The timing may be programmed and detection does not require any connection to the track.  These signals also may be linked so that the down track signal may hold the up track signal YELLOW.

 

 

Bob converts an E8 to DCC and adds LED headlight and mars light

Bob Knobbe Installs DCC in an E9 with LED Lights

 

Jack Zimmer adds Lights to his IC Passenger Train

 

 

Updated 04/07/15
Join us in the “Greatest Hobby” as a member of the TLMRC.